The Illinois Tollway is looking for firms to provide planning, design and construction management services for 10 new contracts totaling $39 million.
The contracts are part of the tollway’s Move Illinois Program, and they’re included in the Professional Services Bulletin 18-2
Contracts advertised as of March 27:
- One planning study contract for the 95th Street Interchange on the Tri-State Tollway (I-294).
- One design contract for bridge work on the Tri-State Tollway (I-294).
- Two design contracts for pavement and bridge preservation on the Reagan Memorial Tollway (I-88).
- One design upon request contract.
- One construction management contract for work on the new I-490 Tollway.
- One maintenance facility construction management upon request contract.
- One construction management contract for the Illinois Route 47 Interchange on I-88.
- Two systemwide construction management upon request contracts.
Firms interested in submitting a proposal can visit the “Doing Business” section on the Tollway’s website illinoistollway.com for more information. Submissions are due April 24, 2018, with contracts expected to be awarded by the Illinois Tollway Board of Directors summer 2018. Work is expected to begin this year.
PSB 18-2 responses will be submitted via the Illinois Tollway’s Web-based Program Management System (e-Builder). See PSB 18-2 for additional details.
Questions related to this PSB must be submitted electronically to the e-Builder SOI Mailbox at: [email protected] no later than ten (10) days prior to the submittal due date. Answers will be addressed via an Addendum.
The Illinois Tollway is an award-winning, user-fee system that receives no state or federal funds for its maintenance and operations.
The agency maintains and operates 294 miles of interstate tollways in 12 counties in Northern Illinois, including the Reagan Memorial Tollway (I-88), the Veterans Memorial Tollway (I-355), the Jane Addams Memorial Tollway (I-90), the Tri-State Tollway (I-94/I-294/I-80) and the Illinois Route 390 Tollway.