Disposal of Concrete Grinding Residue

Spreading should begin a minimum of 1 foot from the shoulder, with each pass of the grinder moving the spread¬ing operation farther down the slope to ensure no build-up of grinding residue.Spreading should begin a minimum of 1 foot from the shoulder, with each pass of the grinder moving the spread¬ing operation farther down the slope to ensure no build-up of grinding residue.

An area of focus within the construction industry throughout the past few years has been the question of how to handle concrete grinding residue (CGR), also known as sawing slurry. Generated during sawing and diamond grinding operations, slurry is the byproduct created when a diamond blade’s cooling water mixes with concrete fines.

Often, governmental regulations dictate onerous slurry disposal procedures without knowing what the material really consists of. This can turn into a time-consuming task for construction workers and it unnecessarily increases costs for the taxpayer.

To address the multifaceted issue of slurry disposal, the International Grooving & Grinding Association (IGGA) has authored a Slurry Best Management Practices guide in which methods are identified that reduce the burden on contractors and taxpayers while ensuring that they act in an environmentally responsible manner.

These recommendations are based, in part, upon research conducted in partnership with North Dakota State University (NDSU). Researchers examined slurry samples from areas throughout the country in order to determine the following: the chemical composition and characteristics of the slurry; the effect slurry has on the mechanical properties of the soil; and what effect slurry has on plant growth.

The best management practices (BMPs) that were subsequently developed assist contractors and specifiers in determining the most effective means of disposal on a project-by-project basis.

Slurry Best Management Practices

Slurry Spreading Disposal

In rural areas that have vegetated slopes, slurry can be deposited on the slopes as the grinding operation progresses down the road. As a part of the contract documents, it is incumbent upon the engineer to identify wetlands and other sensitive areas where slurry discharge operations are not permitted; the spreading of slurry should not take place through these sensitive areas.

The slurry is swept to the edge of the perimeter of the work area, where it begins to solidify, while sawcutting continues.The slurry is swept to the edge of the perimeter of the work area, where it begins to solidify, while sawcutting continues.

The spreading start and stop points need to be clearly marked on the shoulder of the road. Slurry generated while grinding in unpermitted areas should be picked up and hauled for disposal in non-sensitive areas on the job. The slurry should not be allowed to flow across the roadway into adjacent lanes.

Partner Insights
Information to advance your business from industry suppliers
8 Crucial Elements of a Tire Safety Program
Presented by Michelin North America
How High Fuel Prices hurt Your Business
Presented by EquipmentWatch
Selecting the Correct Construction Tire Solution
Presented by Michelin North America

The diamond grinding equipment should be equipped with a well-maintained vacuum system that is capable of removing all standing slurry, leaving the roadway in a damp condition after the grinder passes. The vacuumed material should be spread evenly on the adjacent slopes by dragging a flexible hose or other approved device along the slope.

Ground application of slurry should not take place on the shoulder, but should begin a minimum of one foot from the shoulder with each pass of the grinder moving the spreading operation farther down the slope to ensure no build-up of grinding residue. The slurry should not be spread within 100 feet of any natural stream or lake or within three feet of a water-filled ditch. Efforts must be taken to restrict the spreading operation to above the high-water line of the ditch.

At no time should grinding residue be allowed to enter a closed drainage system. The contractor is responsible for providing suitable means to restrict the infiltration of the grinding residue into the closed drain system.

Slurry Collection and Pond Decanting

In urban and other areas with closed drainage systems, the slurry should be collected in water-tight haul units and transported to settlement ponds constructed by the contractor. These ponds may be constructed within or outside the right-of-way. All locations should be approved by the engineer. The ponds should be constructed to allow for the settlement of the solids and decanting of the water for reuse in the grinding operation.

At the completion of the grinding operation, the remaining water may be used in a commercially useful manner (i.e., dust control, lime stabilization). Any water left in the pond is typically allowed to evaporate. After drying, the remaining solids may be used as a fill material, a component in recycled aggregate or any other commercially useful application. The pond area should be reclaimed to its original condition and vegetated to protect against erosion.

In geographic regions where evaporation is slow to occur, newly introduced drying and solidification agents can be used to accelerate the clean up operation. One such product is SlurryDry, a new product by CETCO Energy Services, which can be added to the settlement pond at 1 or 2 percent of total liquid volume in order to assist with reclamation.

After the sawcutting is complete, the hardened slurry is swept into pile, and is ready for removal.After the sawcutting is complete, the hardened slurry is swept into pile, and is ready for removal.

The product has been tested in the sawing, drilling and floor polishing market, but is just now being introduced to the highway grooving and grinding industry. SlurryDry consists of a granular, super-absorbent polymer which solidifies free water, leaving the solids behind.

For sawing applications, the polymer is placed around the perimeter of a work area to solidify slurry for non-hazardous disposal on the jobsite. After applying the product, which has a strong capillary action, mixing can speed up absorption by allowing moisture to come into contact with the polymer crystals. Once the slurry has solidified into a gel-type solid, it can be shoveled or vacuumed up on flat sawing applications.

After solidification, remaining residue can be vacuumed or dry swept. As an alternative to spreading it across the work site, the product can also be used to solidify slurry inside wet vacuums.

SlurryDry was recently tested as a trial run during repair work at O’Hare International Airport. The product was sprinkled around the perimeter and as slurry gathered on the worksite, it was squeegeed into this perimeter. The slurry solidified to a gel-like substance within 5 minutes, and runoff was retained within the work area. After the work was completed, the slurry was swept into a pile for easy removal.

In a slurry pond application, SlurryDry can be dispersed into the settlement pond and mixed with the excavator or backhoe bucket. Within 5 minutes, the solidified waste can be dealt with in a locally approved manner for fast closure and reclamation of the area.

“SlurryDry is used to solidify the remaining sludge into a non-flowing solid that passes the EPA paint filter test for compliant disposal at jobsites that don’t allow for onsite slurry disposal,” explains Mark Critchfield, National Sales Manager at CETCO.

Slurry Collection and Plant Processing

For plant processing, slurry should be collected and hauled as with pond processing. There are various plant designs that may be used, such as centrifuge, belt and filter presses. The plant site should be prepared to control any storm water runoff in accordance with state regulations.

The site should be restored and vegetated at the completion of operations. The processed water and solids are to be handled in the same fashion as the settlement ponds. The site may be within or outside the right-of-way. Site locations are to be approved by the engineer.

PH Control Plan

With either ground application or the vacuum pickup procedure, the contractor must monitor and control the pH of the slurry. The slurry should be managed to maintain a pH below 12.5 and greater than 2.

At the start-up of operations, the contractor needs to test the pH at least once per hour to ensure it is within the acceptable limits. The test equipment must be calibrated daily and approved by the engineer. Once the pH control plan is operational and producing consistent results, the testing frequency may be reduced to 4 tests per day.

The contractor should log all test results and deliver a signed copy to the engineer weekly. At no time should slurry containing a pH outside the above limits be allowed to be deposited on the ground. The contractor should determine the procedure to be used to maintain the slurry within the acceptable range. The procedure should be approved by the engineer.

Conclusion

By following slurry disposal BMPs and keeping abreast of new product developments that address this widespread industry need, contractors can choose a disposal method that optimizes their job performance while still complying with environmental regulations.

“Contractors have many options available to them when considering the best method of slurry disposal for a job,” said John Roberts, Executive Director, International Grooving & Grinding Association. “New products and beneficial uses for the slurry product are being developed at a rapid rate, providing greater disposal flexibility than ever.”

For more information on best practices, click here.

To learn more about CGR, click here.

About IGGA: The International Grooving & Grinding Association (IGGA) is a non-profit trade association founded in 1972 by a group of dedicated industry professionals committed to the development of the diamond grinding and grooving process for surfaces constructed with Portland cement concrete and asphalt. In 1995, the IGGA joined in affiliation with the American Concrete Pavement Association (ACPA) and in 2012 formed the IGGA/ACPA Concrete Pavement Preservation Partnership (IGGA/ACPA CP3). Today this partnership serves as the technical resource and industry leader in the marketing of optimized pavement surfaces, concrete pavement restoration and pavement preservation around the world. The mission of the IGGA is to serve as the leading technical and promotional resource for the acceptance and proper use of diamond grinding and grooving as well as PCC preservation and restoration. For more information, visit igga.net.