
It was a high-rise job, using a skid steer loader to remove demolition debris on the 21st floor of a building. Above a worker, remote-controlled demolition machines punched holes through the floors to start the demolition process.
The worker was 41 years old and a 14-year veteran of the local Laborers International Union. He had been employed by the contractor for two months during the demolition of a 26-story apartment building.