Tag: 140-foot long temporary pedestrian bridge built in preparation for the 93rd PGA Championship at the Atlanta Athletic Club in Johns Creek

Yodock water-filled barriers part of comprehensive traffic control plan for PGA Championship site
PGA tournament officials added 5,000 feet of Yodock water filled barriers and barricades along the highway from Medlock Crossing to the Athletic Club as part of a comprehensive traffic control plan to manage pedestrian crossings during the four day event
Page 1 of 1