Construction Equipment
Ag Equipment
Roadbuilding
Dealers
Business
Technology
Tag: Lady Bird
Construction Equipment
Lady Bird is the 1,300-ton tunnel-boring machine digging DC’s 13-mile sewer tunnel (PHOTOS, VIDEO)
[imagebrowser id=46] Each year in Washington, D.C., about 2 billion gallons of raw sewage is dumped into the Potomac River, the Anacostia River and Rock Creek, according to a report from the Washington Post. But Lady Bird, a massive tunnel-boring machine, is working to change that. The machine is digging a $2.6 billion 13-mile tunnel system […]
March 19, 2014
Page 1 of 1