Tina Grady Barbaccia (EQW)
Infrasense Inc. has completed subsurface investigations for 21 bridge decks in Wisconsin's southwest region. A suite of nondestructive tests was performed for each bridge deck inspection, including a ground penetrating radar survey, infrared thermography evaluation, and impact echo testing. These tests provided a condition assessment of the reinforced concrete bridge decks without requiring any cores or exposed rebar, and with minimal disruption to traffic flow.,Infrasense Inc. has completed subsurface investigations for 21 bridge decks in Wisconsin's southwest region. A suite of nondestructive tests was performed for each bridge deck inspection, including a ground penetrating radar survey, infrared thermography evaluation, and impact echo testing. These tests provided a condition assessment of the reinforced concrete bridge decks without requiring any cores or exposed rebar, and with minimal disruption to traffic flow.,Infrasense Inc. has completed subsurface investigations for 21 bridge decks in Wisconsin's southwest region. A suite of nondestructive tests was performed for each bridge deck inspection, including a ground penetrating radar survey, infrared thermography evaluation, and impact echo testing. These tests provided a condition assessment of the reinforced concrete bridge decks without requiring any cores or exposed rebar, and with minimal disruption to traffic flow.,Infrasense Inc. has completed subsurface investigations for 21 bridge decks in Wisconsin's southwest region. A suite of nondestructive tests was performed for each bridge deck inspection, including a ground penetrating radar survey, infrared thermography evaluation, and impact echo testing. These tests provided a condition assessment of the reinforced concrete bridge decks without requiring any cores or exposed rebar, and with minimal disruption to traffic flow.,Infrasense Inc. has completed subsurface investigations for 21 bridge decks in Wisconsin's southwest region. A suite of nondestructive tests was performed for each bridge deck inspection, including a ground penetrating radar survey, infrared thermography evaluation, and impact echo testing. These tests provided a condition assessment of the reinforced concrete bridge decks without requiring any cores or exposed rebar, and with minimal disruption to traffic flow.,Infrasense Inc. has completed subsurface investigations for 21 bridge decks in Wisconsin's southwest region. A suite of nondestructive tests was performed for each bridge deck inspection, including a ground penetrating radar survey, infrared thermography evaluation, and impact echo testing. These tests provided a condition assessment of the reinforced concrete bridge decks without requiring any cores or exposed rebar, and with minimal disruption to traffic flow.,Infrasense Inc. has completed subsurface investigations for 21 bridge decks in Wisconsin's southwest region. A suite of nondestructive tests was performed for each bridge deck inspection, including a ground penetrating radar survey, infrared thermography evaluation, and impact echo testing. These tests provided a condition assessment of the reinforced concrete bridge decks without requiring any cores or exposed rebar, and with minimal disruption to traffic flow.,Infrasense Inc. has completed subsurface investigations for 21 bridge decks in Wisconsin's southwest region. A suite of nondestructive tests was performed for each bridge deck inspection, including a ground penetrating radar survey, infrared thermography evaluation, and impact echo testing. These tests provided a condition assessment of the reinforced concrete bridge decks without requiring any cores or exposed rebar, and with minimal disruption to traffic flow.,Infrasense Inc. has completed subsurface investigations for 21 bridge decks in Wisconsin's southwest region. A suite of nondestructive tests was performed for each bridge deck inspection, including a ground penetrating radar survey, infrared thermography evaluation, and impact echo testing. These tests provided a condition assessment of the reinforced concrete bridge decks without requiring any cores or exposed rebar, and with minimal disruption to traffic flow. August 18, 2011
Through mid-July, Case Triple Threat Rodeo events held at Case Construction Equipment North American dealerships have raised almost $35,000 in support of local Habitat for Humanity affiliates.The skills competition program will continue through Oct. 14.
With 35 of the 60 scheduled events completed, the Triple Threat Rodeo program has attracted nearly 5,000 visitors to Case dealerships to watch a total of more than 900 competitors demonstrate their accuracy and speed in completing three diverse skills tests.,Through mid-July, Case Triple Threat Rodeo events held at Case Construction Equipment North American dealerships have raised almost $35,000 in support of local Habitat for Humanity affiliates.The skills competition program will continue through Oct. 14.
With 35 of the 60 scheduled events completed, the Triple Threat Rodeo program has attracted nearly 5,000 visitors to Case dealerships to watch a total of more than 900 competitors demonstrate their accuracy and speed in completing three diverse skills tests.,Through mid-July, Case Triple Threat Rodeo events held at Case Construction Equipment North American dealerships have raised almost $35,000 in support of local Habitat for Humanity affiliates.The skills competition program will continue through Oct. 14.
With 35 of the 60 scheduled events completed, the Triple Threat Rodeo program has attracted nearly 5,000 visitors to Case dealerships to watch a total of more than 900 competitors demonstrate their accuracy and speed in completing three diverse skills tests.,Through mid-July, Case Triple Threat Rodeo events held at Case Construction Equipment North American dealerships have raised almost $35,000 in support of local Habitat for Humanity affiliates.The skills competition program will continue through Oct. 14.
With 35 of the 60 scheduled events completed, the Triple Threat Rodeo program has attracted nearly 5,000 visitors to Case dealerships to watch a total of more than 900 competitors demonstrate their accuracy and speed in completing three diverse skills tests.,Through mid-July, Case Triple Threat Rodeo events held at Case Construction Equipment North American dealerships have raised almost $35,000 in support of local Habitat for Humanity affiliates.The skills competition program will continue through Oct. 14.
With 35 of the 60 scheduled events completed, the Triple Threat Rodeo program has attracted nearly 5,000 visitors to Case dealerships to watch a total of more than 900 competitors demonstrate their accuracy and speed in completing three diverse skills tests.,Through mid-July, Case Triple Threat Rodeo events held at Case Construction Equipment North American dealerships have raised almost $35,000 in support of local Habitat for Humanity affiliates.The skills competition program will continue through Oct. 14.
With 35 of the 60 scheduled events completed, the Triple Threat Rodeo program has attracted nearly 5,000 visitors to Case dealerships to watch a total of more than 900 competitors demonstrate their accuracy and speed in completing three diverse skills tests.,Through mid-July, Case Triple Threat Rodeo events held at Case Construction Equipment North American dealerships have raised almost $35,000 in support of local Habitat for Humanity affiliates.The skills competition program will continue through Oct. 14.
With 35 of the 60 scheduled events completed, the Triple Threat Rodeo program has attracted nearly 5,000 visitors to Case dealerships to watch a total of more than 900 competitors demonstrate their accuracy and speed in completing three diverse skills tests. August 18, 2011
