Tennessee tees up 450 roadbuilding projects

|  April 16, 2009 |

Time to start roadbuilding in the Volunteer State. On the pdf at the link “ARRA” means the project is funded through the stimulus bill. “CN means it’s in the construction phase. “RW” indicates right of way permits are being acquired. And “PE” means the project is in the preliminary engineering phase.

More About: 

Do you want some tips to stay safe on the job site?

Equipment World has created an entire section devoted to safety.

Click here to check it out. »

 

Here are the most recent tips we've posted:

Hauling headaches: Know your load limits when trailering equipment

One-man machines: The operator should be the only person on a wheel loader

advertisement
advertisement
advertisement
advertisement