More From Alaska Department of Transportation

Roadway Reinforcement: Geosynthetics require attention to project design and installation

Roadway Reinforcement: Geosynthetics require attention...

Posted by Chris Hill on Jul 02, 2015

A failed pavement isn’t a welcome sight, particularly during our current uncertain transportation funding. So it’s increasingly important that road ...

Flood-damaged Dalton Highway reopens to traffic in Alaska

Flood-damaged Dalton Highway reopens to traffic in...

Posted by Chris Hill on Jun 08, 2015

The Dalton Highway, the only road between the North Slope oil fields and Fairbanks, Alaska, reopened June 5 as planned, ...

Alaska DOT spends $171,000 on avalanche tool

Alaska DOT spends $171,000 on avalanche tool

Posted by Brian Ethridge on Dec 31, 2014

The Alaska Department of Transportation has a new tool that should help reduce the hazards avalanches pose along Seward Highway and ...

Better Bridges 2012 Bridge Inventory

Better Bridges 2012 Bridge Inventory

Posted by Tina Grady Barbaccia on Nov 12, 2012

Getting Better all the Time   America’s structurally deficient and functionally obsolete bridge count slowly, steadily falling   By Tina Grady Barbaccia   They aren’t numbers ...

Delineator bounces back when hit

Delineator bounces back when hit

Posted by Tina Grady Barbaccia on Feb 21, 2012

Pexco LLC partnered with the Alaska Department of Transportation to develop a new design of delineator that would improve visibility ...

advertisement
advertisement
advertisement
advertisement