DECREASING YOUR WORK LOAD AND YOUR LABOR COSTS

|  November 14, 2008 |

The Mud Bucket® from Loegering reduces the back breaking manual labor and costs involved with placing concrete. The unique design allows for hauling up to a 1/2 yard of concrete depending on your loader capcity. Why stop there? The Mud Bucket® can haul any flowable material around your jobsite. 

The hydraulic gate unloads your material with no additional labor. You can now accurately place your concrete with the Extension/Reduction chute that reduces to a 9″ wide opening (228.6mm).  This 14″ long chute places material accurately, reducing spillage and unexpected costs, making you more profitable. 

Mud Bucket® Mounting Instructions

The Mud Bucket® is designed to mount to your machine quickly, using your existing attachment mounting system. Please refer to the machine owner”s manual for instructions on how to secure your Mud Bucket®

Hydraulic connections: Your Mud Bucket® will come complete with hydraulic cylinder and hoses as shown below. Hydraulic couplings vary between manufacturers therefore, your Mud Bucket® does not come with couplings. The hose ends of your Mud Bucket® are fitted with 1/2″ male NPT fittings. Correct male and female couplings can be purchased from your local equipment dealer. Consult your machine owner”s manual for auxiliary hydraulic operation.

advertisement
advertisement
advertisement
advertisement
advertisement
Show us your ink! Construction tattoo contest winner gets $500 Click here to enter.
Hello. Add your message here.